Distillation Plant Basic data: 10 x 30m3 Storage Vessel, Distillation and Dehydration Unit Project Year: 2022./23. Status: Delivered Distillation Plant Complete factory Chemical Industry FEED Engineering AISI 316 Stainless Steel This project is taking place from January 2022. and it's scheduled to be finished by end of December 2023., and the project itself consists of the design, feed engineering and manufacturing of process industry Equipment for distilation. Equipment that we are going to manufacture is 10 x 30 m3 vessels, distillation and dehidration unit. The main material on the distillation project is AISI316. Project scope: Equipment design and engineering Feed Engineering Material Purchase Process Industry Equipment Pressure test Packing of Equipment Project Photos Vessels Dehidration Distillation