Vessel 92 ㎥ Basic data: 1 pcs. heated tanks 92 ㎥ for the beverage industry. Project Year: 2025. Status: In production Read more: Vessel 92 ㎥
Spray drying plant SD120 Basic data: Turnkey spray drying plant with capacity of 120 kg/h of evaporated water. Project Year: 2024./25. Status: Engineering Read more: Spray drying plant SD120
3-line CIP System Basic data: Complete CIP 3-line system, including vessels, pipelines and automation. Project Year: 2024./25. Status: In production Read more: 3-line CIP System
Storage vessels 24000 l. Basic data: 6 pcs. of heated, insulated stainless steel vessels, capacity 24000 l. Project Year: 2024.-25. Status: Delivered Read more: Storage vessels 24000 l.
Chocolate bars line (#3) Basic data: Plant for processing chocolate for chocolate bars manufacturing. Project Year: 2024./25. Status: Delivered Read more: Chocolate bars line (#3)
Chocolate bars line (#2) Basic data: Plant for processing chocolate for chocolate bars manufacturing. Project Year: 2023./24. Status: Delivered Read more: Chocolate bars line (#2)
Fluidized Bed Dryer Basic data: Fluidized Bed Dryer for chemical industry. Project Year: 2023./24. Status: Delivered Read more: Fluidized Bed Dryer
Tomato concentrate line Basic data: Plant for processing tomatoes into concentrate with capacity of 300t./day. Project Year: 2023./24. Status: In production Read more: Tomato concentrate line
2TVR2 (lactose monohydrate) Basic data: Complete plant for evaporation and drying of lactose monohydrate. Project Year: 2022./23. Status: Delivered Read more: 2TVR2 (lactose monohydrate)