The project is being carried out in Croatia as part of the national energy sector, with implementation planned from 2026. to 2030. Our scope includes the manufacture and installation of the generator cooling system, as well as participation in the reconstruction of the hydroelectric power plant’s generating units.
The project covers the installation of cooling systems and associated piping for Units A and B at the Hydroelectric Power Plant, including testing, commissioning, and technical handover. The scope also includes project coordination, schedule management, quality control, safety and technical documentation, factory and on-site acceptance testing, and delivery of all required final documentation.
Project scope:
- Material purchase
- Equipment manufacturing
- Packing & Shipping of Equipment
- Installation